Uncategorized

NO – BGO – Bergen

Bergen Coordinated Airport Level 3 Important information The runway will be shortened from start of summer season to 28. FEB to 14.JUN. The airport will also implement a night closure in the period 26 May – 14 June 2018.   Constraints: Runway Capacity: Runway per any 60 minutes period:  25 movements – 29 in peak …

NO – BGO – Bergen Read More »

SE – VBY – Visby

Visby AirportVBY – ESSVLevel 2 Duty Officer +46 (0)10 109 5220 VBY W20 Coordination Parameters VBY S21 Coordination Parameters Visby Airport Homepage

NO – TOS – Tromso

Tromso Airport / level 3 ACN act as schedule facilitator Terminal capacity: 800 departing seats per rolling hour and 300 departing seats per hour for international flights. 45 minutes between international arrivals (including Longyearbyen – Svalbard). For further information, please refer to Tromso Airport

NO – TRD – Trondheim

Trondheim Airport / Level 3 Terminal constraints: Terminal capacity:  1 500 departing passengers in any 60 minutes period Limit of 1 000 international arriving passengers in any 60 minutes period Limit of 600 departing non-Schengen passengers in any 60 minutes period Limit of 7 international departures in any 60 minutes period Limit of 1 category E-aircraft at any one …

NO – TRD – Trondheim Read More »

DK – BLL – Billund

Billund Airport / level 3 Declared capasity: Runway Capasity: Arr Dep Mvt Timespan min. 3 4 4 5 7 9 8 15 Rolling 30 22 32 60 Rolling Terminal capasity: Arr Dep Total Timespan 1400 1300 2100 Rolling 60/5 min. Non Schengen Departure Max 375 passengers per rolling hour Except in the below mentioned hours …

DK – BLL – Billund Read More »