Uncategorized

FI – HEL – Helsinki

Helsinki Vantaa Airport / level 3 Capacity: HEL Coordination Parameters S23 HEL Coordination Parameters W23 General and Business Aviation: For GA/BA please send your request to GAslot.efhk@finavia.fi An operator or a handling agent authorized by the operator must request an airport slot for an arrival and departure as a minimum 3 hours before the planned

FI – HEL – Helsinki Read More »

NO – TRD – Trondheim

Trondheim Airport – Værnes (ENVA – TRD) Coordination status: Level 3 Slot Requests: scr@airportcoordination.com General Requests: acn@airportcoordination.com GA/BA Coordination: Slots not required for GA/BA aircraft of ICAO category A and B Coordination Parameters : Runway Capacity: No runway restrictions. Terminal capacity: 1500 offered departing seats in any 60 minutes period. Maximum 600 offered departing seats in any

NO – TRD – Trondheim Read More »

NO – SVG – Stavanger

Stavanger Airport – Sola (ENZV – SVG) Coordination status: Level 3 Slot Requests: scr@airportcoordination.com General Requests: acn@airportcoordination.com GA/BA Coordination: Slots not required for GA/BA aircraft of ICAO category A and B.   Coordination Parameters: Runway Capacity: Runway in any 60 minutes period: 28 movements; limited to 15 arrival and 15 departures. Terminal capacity: Maximum of 2 arriving

NO – SVG – Stavanger Read More »

NO – BOO – Bodo

Bodø Airport (ENBO – BOO) Coordination status: Level 2 Slot Requests: scr@airportcoordination.com General Requests: acn@airportcoordination.com GA/BA Coordination: Slots not required for GA/BA aircraft. Coordination Parameters: Runway Capacity:  Max number of movements per rolling hour: Arr:  13 Dep: 13 Tot: 25 Terminal capacity:  Max 2 aircrafts that involve international passenger operations at any time. Schengen and non-Schengen flights

NO – BOO – Bodo Read More »

NO – KRS – Kristiansand

Kristiansand Airport – Kjevik (ENCN – KRS) Coordination status: Level 2 Slot Requests: scr@airportcoordination.com General Requests: acn@airportcoordination.com GA/BA Coordination: Slots not required for GA/BA aircraft of ICAO category A and B. Coordination Parameters : Runway Capacity: Max 6 movements, of which max 4 departures, per 20 minutes. Terminal capacity: Departure: Max 600 departing passengers per 60 minutes.

NO – KRS – Kristiansand Read More »

NO – AES – Aalesund

Ålesund Airport  (ENAL – AES) Coordination status: Level 2 Slot Requests: scr@airportcoordination.com General Requests: acn@airportcoordination.com GA/BA Coordination: Slots not required for GA/BA aircraft of ICAO category A and B – exception according to above if overnight stop is required. Level 2 Runway Capacity: No runway limitation as limiting factor Terminal capacity: Arrival: Max 1 Non-Domestic arrival per

NO – AES – Aalesund Read More »

NO – HAU – Haugesund

Haugesund Airport – Karmøy (ENHD – HAU) Coordination status: Level 2 Slot Requests: scr@airportcoordination.com General Requests: acn@airportcoordination.com GA/BA Coordination: Slots not required for GA/BA aircraft of ICAO category A and B. Coordination Parameters: Runway Capacity: No runway limitation as limiting factor. Terminal capacity: Arrival: Max 1 Non-Domestic arrival per 30 minutes. Departure: Max 1 Non-Schengen departure per

NO – HAU – Haugesund Read More »